Skip to content
PK Building Contractor LtdFree quote
← Building advice

Can you have building work done in winter? What a Somerset builder will tell you

By Peter, who has been building across Somerset for over 20 years · 18 November 2026

Yes, most building work can go ahead in winter. Indoor jobs such as kitchens, bathrooms, tiling and flooring are hardly affected by the weather. Outdoor work such as foundations, brickwork and concrete can still be done, but it has to stop on frosty days and be protected properly. A good builder plans for that rather than hoping for a mild spell.

Here is what actually changes between November and March, and what to ask before you sign.

Which jobs are barely affected by winter?

Anything inside the house, once the building is watertight. Kitchen and bathroom refits, tiling, flooring, plastering inside a heated room, and fitting out a loft or extension shell all carry on much as normal. Winter can even suit these jobs, because you are less likely to want the house free for the garden or holidays.

The things to allow for are shorter daylight hours, wet boots and mud coming into the house, and heating. If your boiler or hot water is going to be off for a day or two during a bathroom refit, tell your builder and ask them to plan around the coldest days.

Which jobs are affected by winter?

Anything that relies on mortar, concrete, render or screed setting properly. Cold slows setting down, and frost can ruin new work before it has gained strength. That mainly means:

  • Bricklaying and blockwork. NHBC’s standards for masonry (the 2025 edition, section 3.2.5) say brickwork and blockwork should not be built when the air temperature is below 3°C and falling. Work can restart once it reaches 1°C and is rising, with the expectation of going above 3°C. Frozen or frost-damaged materials should not be used. Earlier editions used a 2°C figure, so you may see either quoted. Source: NHBC Standards, 3.2.5 Masonry.
  • Concrete. NHBC’s concreting guidance (2019 edition) says concrete work should not go ahead at an air temperature of 2°C unless specific conditions are met, including that the ground is not frozen. Fresh concrete needs covering to keep it above freezing, with insulation where light overnight frost is expected. Source: NHBC Standards, 3.2.4 Concreting.
  • Render, plastering and screeding. NHBC’s 2023 guidance says these should not be carried out if there is frost on the structure, and render should not go on at or below 2°C or when it is likely to fall that low. Source: NHBC Standards, 3.2.6 Rendering, plastering and screeding.

NHBC’s standards are written for new homes, but they are widely used as the benchmark for good practice, so they are a fair test of whether a builder knows what they are doing. Your building control officer will also expect the work to meet the regulations whatever the month.

In plain terms: on a hard-frost morning, a careful builder will not lay bricks or pour a slab. That is not laziness. It protects the quality of the wall you will be living with for decades.

Can you build an extension in winter?

Yes, and many people do, but the start date matters more than the season. The weather-sensitive part is the first few weeks: foundations, drainage and brickwork up to roof level. Once the roof is on and the openings are closed up, the rest is interior work and the weather matters far less.

So the useful question is not “can we start in December?” but “how much of the outside work will be done before the worst of the cold?” If the shell is going up in January and February, expect some lost days. If the roof is on by Christmas, the cold months are spent mostly indoors.

In Somerset the bigger enemy is often wet rather than frozen ground. Heavy rain turns a site to mud and can stop digging and deliveries, particularly on low-lying ground.

Does winter building cost more, or take longer?

It can take longer, and you should allow some contingency for it. Lost frost days, short daylight and wet ground all add up, particularly on outdoor work. Don’t assume a winter discount. Always compare quotes on what they include, not just the total.

We don’t give timings or prices in a blog post, because every job is different. Ask for them in writing for your own project.

What should you ask a builder before starting in winter?

These five questions will tell you a lot:

  1. What is your cold-weather plan? They should be able to describe covers for new brickwork, protection for fresh concrete and how they will keep bricks, blocks and sand dry.
  2. What happens on frost days? Do they stop work, and how is that reflected in the programme?
  3. Is the building watertight before the interior work starts? Plasterers and decorators need dry, frost-free conditions.
  4. How will heating be handled? Drying out plaster and screed often needs temporary heaters, and you should know who pays for the energy.
  5. Who protects stored materials and your property? Wet or frozen materials should not be used, and your driveway and garden need a plan too.

Quick answers

Is it too cold to lay bricks? Under NHBC’s 2025 masonry guidance, brickwork should not be built when the air temperature is below 3°C and falling. It can restart once the temperature is 1°C and rising and expected to exceed 3°C.

Can concrete be poured in winter? Yes, with precautions. Guidance says it should not go ahead at around 2°C unless the ground is not frozen and the concrete is protected, covered and kept above freezing while it gains strength.

Can you plaster or screed in winter? Yes, indoors, as long as there is no frost on the structure. Temporary heating is often needed while it dries.

Is winter a bad time for a kitchen or bathroom refit? No. Interior work is barely affected by the weather once the building is watertight. Allow for shorter days, and plan for any time without heating or hot water.

Should I wait until spring to start? Not necessarily. Starting the outdoor work after the worst of the frost can help, but a good builder can plan a winter job around the weather. Ask for their plan in writing.

Talk to us

If you are planning an extension or other building work in or around Bridgwater, Taunton or Weston-super-Mare, message or call us on WhatsApp or 07849 319356 and we will tell you straight what is realistic for your project and the time of year.

Planning extension work? See what our extensions service includes.

Get a free extension quote

The quickest way is to call or WhatsApp. If you would rather write it down, use the form and we will come back to you.

  • We reply usually within 10 minutes, during working hours
  • Free, no-obligation quotes after a site visit
  • Fully insured, over 20 years in the trade
  • Around 9 in 10 jobs come from repeat customers and referrals
“Peter and team did a brilliant job tiling. They gave great advice on the best way to do it. They levelled the walls, waterproofed the shower area and then tiled the floor and walls. Really pleased with the quality of the finish, thank you!! I would highly recommend.”
Nathan, bathroom tiling

1 of 4

First, who should we reply to?

We save your answers as you go, so if you don't finish we can still call you about your job. We only use them for that (privacy).

CallWhatsApp
WhatsApp — we reply by 9am